FINANCING ELECTRICITY INFRASTRUCTURE IN NIGERIA: BANKABILITY, RISK ALLOCATION AND LEGAL SAFEGUARDS FOR PROJECT INVESTORS

Nigeria’s electricity sector has long struggled to provide reliable and adequate electricity to consumers. In response, successive governments have pursued reforms intended to improve the...


1. Introduction

Nigeria’s electricity sector has long struggled to provide reliable and adequate electricity to consumers. In response, successive governments have pursued reforms intended to improve the sector’s performance and attract private investment into generation and distribution. The Electric Power Sector Reform Act 2005 (EPSRA) provided the framework for restructuring the former National Electric Power Authority and privatising key assets of the Power Holding Company of Nigeria. The Electricity Act 2023 has since replaced EPSRA and provides the current statutory framework for the Nigerian electricity market.¹

The case for private participation is clear. Developing a power plant requires substantial upfront capital, long construction periods and continuing expenditure on fuel, maintenance and operations. Investors therefore need confidence that the electricity generated will be purchased and paid for over a period sufficient to recover their investment and earn a reasonable return. This is not a straightforward proposition in a market where many consumers cannot afford the full cost of electricity and where the financial position of market participants has been affected by tariff shortfalls, weak revenue collection and delayed payments.

The central commercial question is therefore: what makes investment in an independent power project (IPP) attractive in Nigeria, and what gives an investor reasonable assurance that the project will generate sufficient and dependable revenue? This question has become more pressing following the transition towards bilateral electricity trading, under which generation companies (GenCos) are expected to contract more directly with distribution companies (DisCos) and other eligible purchasers.

This article considers the bankability of IPPs under the emerging bilateral market. It argues that while direct contracting may promote competition and reduce the Federal Government’s exposure to market shortfalls, it will not, by itself, resolve the underlying payment problem. The success of the new arrangement depends on the financial capacity of purchasers, credible payment security and a regulatory framework that supports the practical enforcement of contractual obligations.

2. From the NBET Model to Bilateral Trading

Following the restructuring of the sector, the Nigerian Bulk Electricity Trading Plc (NBET) was established to act as an intermediary purchaser of electricity from GenCos and seller to DisCos. The arrangement was designed to address a practical problem: the distribution companies were not initially considered sufficiently creditworthy to enter into long-term power purchase agreements (PPAs) directly with generators. NBET was intended to provide a more credible off-taker and, with appropriate government support, give generators and their lenders greater confidence in payment.

The model, however, did not eliminate the sector’s liquidity difficulties. NERC’s 2024 Order on the Transition to Bilateral Trading identified inadequate revenue across the electricity value chain as a continuing problem. It specifically referred to non-cost-reflective end-user tariffs, delayed subsidy disbursements and poor billing and collection by DisCos as factors contributing to market shortfalls. The Commission also observed that NBET’s reliance on ad hoc budgetary appropriations, Power Sector Recovery Programme funding and the Federal Government’s balance sheet had limited its ability to attract new IPPs on a project-finance basis.²

Against this background, NERC issued Order No. NERC/2024/058, effective from 25 July 2024, pursuant to section 7(2) of the Electricity Act 2023. The Order directed NBET to cease entering into new contracts for the purchase and resale of electricity. It also required relevant GenCos to pursue bilateral arrangements with DisCos, while retaining NBET’s role in administering certain existing firm contracts and an interim pool for residual capacity. The Order therefore does not abolish NBET or immediately remove it from all market transactions; it changes the structure of new contracting and preserves specified transitional arrangements.³

The commercial objective is understandable. Direct contracting is intended to encourage market discipline, allow DisCos to secure electricity from suppliers on terms suited to their needs and reduce the Federal Government’s exposure to market risks. The Order also prioritises bilaterally contracted energy in the dispatch and payment arrangements and requires bilateral capacity to be aligned with the generation costs recoverable through approved end-user tariffs.⁴

For investors, however, the transition changes the identity of the party whose creditworthiness matters most. Under the NBET model, the generator primarily looked to NBET for payment, supported by the wider government-backed market structure. Under bilateral trading, a generator entering into a new PPA must pay much closer attention to the financial position of the particular DisCo or other purchaser with which it contracts. The risk is no longer concentrated in one intermediary; it is increasingly assessed across individual commercial relationships.

3. The Bankability Question: A Contract Is Only as Strong as the Purchaser

An IPP is bankable when its expected revenue is sufficiently reliable to persuade investors and lenders to commit capital. A long-term PPA is usually central to that assessment because it establishes the basis on which electricity will be sold, the price or pricing mechanism, the duration of the arrangement and the consequences of non-payment or other default. For a lender, the PPA is not simply evidence that a buyer exists; it is a key source of confidence that the project can generate cash to service its debt.

But a signed PPA does not create money where the purchaser has none. A generator may construct and operate a power plant, make electricity available and comply with its contractual obligations, yet still face serious financial difficulty if the purchaser cannot pay for the electricity supplied. Delayed or incomplete payments can affect the generator’s ability to pay gas suppliers, meet operating expenses, maintain the plant and repay project financing. In this sense, the purchaser’s financial capacity is as important as the commercial terms of the PPA.

The concern is not theoretical. NERC’s 2024 Order itself records the persistent liquidity challenges in the market and notes that, as at June 2024, only eight of the 28 GenCos trading with NBET had fully effective contracts supported by some form of payment guarantee. The remaining plants largely operated under take-and-pay arrangements without payment guarantees, contributing to growing debts for electricity supplied.⁵ The Order also links weak payment performance and plant unavailability to wider problems affecting the reliability of electricity supply.

The position of Kaduna Electric provides a further illustration of the financial pressure within the distribution segment. It is important to clarify that Kaduna Electric is a DisCo, not a GenCo. Its financial and regulatory difficulties are relevant because a distribution company may be a direct purchaser under the bilateral model. If a prospective purchaser is already struggling to meet its market obligations, an investor cannot assume that a new bilateral PPA will be bankable merely because it is legally binding. The purchaser’s payment record, collection performance, existing liabilities and access to working capital must be examined before the project reaches financial close.⁶

This is the central weakness that the bilateral transition must address. Moving from NBET to direct contracting may change who owes the money, but it does not automatically improve the ability of the market to pay. If the purchaser remains financially weak, the generator may simply inherit the same liquidity risk in a different contractual form.

4. Azura-Edo: What a Bankable Project Looks Like

The Azura-Edo IPP demonstrates how a combination of contractual and financial support can make a major power project attractive to private investors. The 459MW gas-fired project reached financial close in December 2015, with total financing of approximately US$876 million. It sold electricity to NBET under a long-term take-or-pay PPA and benefited from a wider package of support designed to address payment, political, construction and operational risks.⁷

The project’s bankability did not rest on the PPA alone. The World Bank provided guarantee support, including a payment guarantee of up to US$120 million to support NBET’s payment security obligations under the PPA and a separate debt mobilisation guarantee. MIGA provided political risk cover, while the International Finance Corporation participated in the financing. The project also benefited from a Put and Call Option Agreement with the Federal Government, structured to provide termination payment assurance while limiting the direct impact on the Government’s balance sheet. In specified early termination circumstances, the project company could require the Government to purchase the plant or its shares at a price designed, at a minimum, to cover outstanding debt.⁸

Other features also mattered. The project was located close to established gas infrastructure and transmission substations, reducing fuel supply and evacuation concerns. Its financing included a local currency tranche, which helped reduce the mismatch between naira revenues and foreign currency liabilities. Construction and supply-chain risks were also addressed through the project’s contractual arrangements and selection of experienced contractors and suppliers.⁹

The lesson for prospective investors is not that every project must obtain the same level of sovereign or multilateral support. Such support may not be available or fiscally sustainable for every transaction. Rather, Azura shows that lenders look for a package of arrangements that makes the project’s revenue dependable and addresses risks capable of undermining repayment. A PPA, payment security, credible termination arrangements, reliable fuel supply and a viable route to evacuate electricity must work together.

The bilateral market must therefore provide a credible alternative to the payment support that helped make projects such as Azura bankable. If a generator is expected to contract directly with a DisCo, the transaction must establish how the DisCo’s payment obligations will be secured and what practical recourse is available if it fails to pay.

5. Risk Allocation and Practical Investor Safeguards

Risk allocation remains important, but it should be commercially realistic. The objective is not to transfer every possible risk to one party. It is to place each risk on the party best able to control, manage or absorb it. As George Nwangwu observes in his study of Nigeria’s electricity privatisation, an imbalance arises where risks are imposed on a private-sector participant without considering whether that participant has the capacity to manage them. Such an approach can undermine the project and the wider investment objective.¹⁰

For an IPP, the principal risks will commonly include purchaser payment risk, fuel supply risk, construction and operating risk, exchange-rate risk, changes in law and regulation, and events beyond the parties’ control. A generator may be best placed to manage plant performance and maintenance. A gas supplier may be responsible for agreed fuel supply obligations. A purchaser should remain responsible for payment for electricity properly supplied. Risks arising from government action or political events may require specific contractual protection, insurance or support from a third party.

For investors considering a bilateral PPA, the following protections deserve particular attention:

• Counterparty due diligence. The investor should assess the purchaser’s financial statements, payment history, revenue collection, tariff position, outstanding market obligations and ability to meet future commitments. Regulatory licences and contractual capacity should also be verified.

• Payment security. Depending on the purchaser and the project, security may take the form of a bank guarantee, letter of credit, funded escrow account, parent-company guarantee or support from a creditworthy third party. The instrument must be properly documented, available when needed and supported by a realistic replenishment mechanism. A security instrument that cannot be funded or renewed offers limited protection.

• Clear payment and default provisions. The PPA should specify invoicing procedures, payment dates, interest on late payment, notice and cure periods, events of default, suspension rights and termination consequences. These provisions should be negotiated with the project’s financing documents in mind.

• Termination and lender protection. Where appropriate, the PPA should include termination payments that address outstanding senior debt and provide lenders with notice, cure and step-in rights. Step-in rights should identify a practical route for a lender or qualified replacement operator to preserve the project, rather than merely state an abstract right that cannot be exercised.

• Fuel and operational arrangements. A gas-fired IPP should ensure that its PPA is supported by a sufficiently reliable gas supply agreement. NERC’s 2024 Order expressly requires capacity under bilateral contracts to be supported by firm gas supply agreements on a take-or-pay basis, with appropriate liquidated damages for supplier default. This reflects the commercial reality that a generator cannot deliver contracted electricity without dependable fuel supply.¹¹

• Tariff and foreign exchange exposure. Investors should consider whether the tariff mechanism allows for changes in relevant costs, including inflation and foreign exchange movements, and whether the purchaser can recover the relevant generation costs through approved tariffs. Where project costs or debt are denominated in foreign currency but revenues are earned in naira, the project must address that mismatch through tariff indexation, hedging, local currency financing or other suitable measures.

• Dispute resolution and enforceability. The PPA should contain a clear dispute resolution mechanism, including the governing law, forum, procedure and interim relief where appropriate. However, an arbitral award or court judgment is only commercially useful if it can be enforced against assets or supported by payment security. Investors should therefore assess the practical ability to recover sums due, not merely the theoretical availability of legal remedies.

6. The Role of Government and the Regulator

The transition to bilateral trading should not be understood as a withdrawal of government from the electricity market. Private investment is essential, but electricity is a strategic service and the commercial viability of the sector depends on a functioning regulatory and institutional framework. The Government need not guarantee every private transaction; it must, however, ensure that the rules governing the market are clear, stable and consistently enforced.

NERC’s 2024 Order recognises that bilateral trading must be supported by tariff arrangements capable of covering the costs of contracted electricity. It requires bilateral capacity to be aligned with the generation costs recoverable through end-user tariffs and provides for monthly tariff reviews to take account of macroeconomic changes. It also directs NERC and NBET to work with relevant government agencies to support a credible financing plan for approved tariff policies.¹² These measures are important because a purchaser cannot sustainably meet its obligations if the revenue it is permitted to collect is structurally insufficient.

The Electricity Act 2023 provides the statutory framework for the Commission’s role in developing the market and regulating relevant licensees. That framework must be matched by effective supervision, timely intervention where licensees fail to meet their obligations, and transparent implementation of market rules. Regulatory intervention may be necessary to protect consumers and maintain market stability, but it should also give investors confidence that contractual and payment obligations will not be disregarded without consequence.

There is also a need for a more predictable approach to payment security in bilateral transactions. The market should not depend entirely on the negotiating strength of individual generators or on ad hoc government support. NERC can promote standard minimum requirements for payment security, transparent disclosure of purchaser performance and clear consequences for persistent non-payment. Where a purchaser cannot provide adequate security, the market rules should provide a credible mechanism to limit the exposure of generators and lenders.

Government support should be targeted and carefully structured. Guarantees and credit enhancement can help unlock financing, particularly for projects that deliver significant public benefits, but they create contingent liabilities and should not become a substitute for sustainable tariffs and efficient revenue collection. The longer-term objective must be to build commercially viable purchasers and a market in which payment obligations are met from predictable sector revenues.

7. Conclusion

Nigeria’s transition to bilateral electricity trading offers an opportunity to develop a more competitive electricity market and attract the private capital needed to expand generation capacity. However, the success of the transition will depend on more than the execution of bilateral PPAs. Investors must be satisfied that the purchaser has the financial capacity to pay, that payment security is credible and that contractual remedies can be enforced in practice.

Azura-Edo demonstrates that private investment can be mobilised where revenue arrangements are supported by appropriate payment guarantees, risk mitigation and institutional support. NERC’s 2024 Order, on the other hand, acknowledges that the sector’s liquidity challenges remain rooted in inadequate revenue, tariff shortfalls and weak collection. These problems do not disappear simply because NBET is no longer permitted to enter into new purchase and resale contracts.

The priority should therefore be to make the bilateral market investable. This requires financially viable purchasers, tariffs that reasonably reflect the cost of supply, properly funded payment security, balanced risk allocation and consistent regulatory enforcement. The Government need not assume every commercial risk, but it cannot stand aloof from the conditions that determine whether the market is capable of meeting its obligations.

Ultimately, the bankability of an IPP will depend on whether the electricity it generates can be converted into reliable cash flow. A PPA may establish the right to payment; a bankable market must provide a credible means of receiving it.

ENDNOTES

1. Electric Power Sector Reform Act 2005 (repealed); Electricity Act 2023. The Electricity Act 2023 replaced EPSRA and provides the current statutory framework for the Nigerian electricity market.

2. Nigerian Electricity Regulatory Commission (NERC), Order on the Transition to Bilateral Trading in the Nigerian Electricity Supply Industry, Order No. NERC/2024/058 (25 July 2024), paras 14–17.

3. Electricity Act 2023, s 7(2); NERC, Order No. NERC/2024/058 (25 July 2024), paras 18–19. The Order preserves NBET’s administration of specified existing firm contracts and provides for an interim NBET pool for residual capacity.

4. NERC, Order No. NERC/2024/058 (25 July 2024), paras 19(J)–(M). The Order prioritises bilateral energy and NBET firm capacity over residual take-and-pay capacity and establishes a payment waterfall for DisCo revenue collections.

5. ibid, paras 14–16. NERC recorded that only 8 of 28 GenCos trading with NBET had fully effective contracts supported by some form of payment guarantee as at June 2024.

6. See ‘The Bankability of Power Purchase Agreements in Nigeria’s Transitioning Electricity Market’ (SSRN working paper supplied for this article), especially the discussion of DisCo creditworthiness and regulatory intervention in Kaduna Electric. The paper is treated as a secondary working paper; any specific figures or claims should be checked against the relevant NERC performance report or intervention order before publication. Kaduna Electric is a distribution company, not a generation company.

7. World Bank Group, Nigeria Azura-Edo IPP: A World Bank Group Project Based Payment Guarantee Case Study (Financial Solutions Brief supplied for this article). The brief identifies a 459MW gas-fired project, financial close in December 2015 and total financing of approximately US$876 million.

8. ibid. The brief describes the World Bank payment guarantee supporting NBET’s payment security obligations, MIGA political risk cover and the Put and Call Option Agreement with the Federal Government. The PCOA was structured to provide termination payment assurance, with the purchase price designed at a minimum to cover outstanding debt.

9. ibid. The brief identifies the project’s proximity to gas infrastructure and grid substations, the local currency financing tranche and construction/supply-chain risk mitigation measures.

10. George Nwangwu, ‘Risk Allocation and Mitigation in Nigeria’s Privatisation Programme—A Case Study of Electric Power Sector Privatisation’ (2021) 9 Journal of Power and Energy Engineering 1, DOI: 10.4236/jpee.2021.98001. The paper discusses political, demand, exchange-rate and force-majeure risks and cautions against allocating risks to parties unable to manage them.

11. NERC, Order No. NERC/2024/058 (25 July 2024), para 19(L). The Order requires GenCo capacity under bilateral contracts to be supported by firm gas supply agreements on a take-or-pay basis, with adequate liquidated damages for supplier default.

12. ibid, paras 19(M)(ii)–(vi).